Showing posts with label UFO. Show all posts
Showing posts with label UFO. Show all posts

Wednesday, December 05, 2007

Reality check

These days I am doing this most of my time:
Mommy knits by Anke Leen

because I'm faced with this:
Xmas projects

Taking it all to pieces:
Mitts - nearly half done
Chevalier mitts - one is done, but I need to frog it, because I knit it way too tight. Second is just a few rows from the end and looks a lot better with the changed gauge and modifications I made.

Wait yarn
This is going to be my granny's mitten-matching hat, which just awaits until I finish mitts and can use the leftover yarn to knit top part of the hat. Did I already mention that it ought to be done TODAY?

Next on my knitting schedule:
Annimanni Warm Winter - half done
Little lady's warm winter depends on whether I will stick to my plan and finish a pair of pants and /or mitts, socks, scarf and hat in the next three days. Which is doubtful, because I'm behind with my granny's gift. I may do the smaller pieces on the plane. Note to myself: get bamboo circulars and dpns. And oh, yes, buttons.
Make second note: find all the notes on scraps of paper and write together the pattern. Maybe on the plane? Erm.. the flight is during the night... shooo....

Next Monday should start with this:
ugh... plan, cut, frog, graft
I've planned total of 2,5 - 3 days on it, because I need to do my maths well and then cut - and not just one thing, but 4 - two sleeves and two body pieces! Pick up the stitches, knit the body and sleeves longer in stockinette stitch and then graft the sleeves. Then hide the million and two ends... yeah, can do it... in my dreams...

And then I have this:
Merino Soft
Which is Anke Leen's sweater. Yeah, I know... plus she needs mitts, hat and scarf and maybe, just maybe, I can squeeze in some woolen socks as well. Deadline: 18th December. Planned number of days for sweater - 4. Planned knitting of small pieces: before or during flight. Oh, right, the flight is already planned full.

And this:
Print O' the Wave
Which isn't exactly a Christmas project, but was meant to be traveling project. Looking at it all now: for my !next! trip over continent... maybe.

All my knitting right now totals to 16 days, and it ought to be done for the 22nd. Most of these things have to be ready for the 18th though. But knowing all sorts of things always come popping out, I'm not that confident.

Not not mention housework, some shopping for other gifts and household items, finding a maid for when I'm away and running tons of other errands, meeting up with some people and such. Luckily Saturday evening's dinner was canceled and I do not have to spend near 8 hours shopping and cooking and cleaning. Woohoo, knitting time.

Wednesday, May 09, 2007

WIPs

I've been moving my hands a lot lately.
As well as trying to finish Equinox Yoke Pullover from Interweave Knits Fall 2006, Which should become something like this:
And instead is like this (I strated it right after Christmas, but got caught up by other projects and now picked it up, for in the light of possible translocation I need to get UFOs finished and as mucha s yarn possible used up):
And the true colors:
It now has been waiting for that free evening of weave-the-million ends-sew-up-garment-motivation. I think you see my problem.
Plus I am afraid to sew it up and re-block for it is obviously too short now, and maybe it won't "stretch" :(

I also have once again fallen into the Norah Gaughan entrapment skills and followed by the glorious arrival of the book called "Knitting Nature" which made me dig out my Debbie Bliss Cathay and start knitting franctically hoping to finish it before Ponte...
instead it made a blister on my finger and made me realize that this is yet-another-to-cry-about-Gaughan-sans-néné-design. Does anyone have an idea how to make the floppy "ears" below armpits go away. Blocking doesn't help. I have hope in placing straps differently or maybe.... I just have to rip.

In the mean time, for I was saddened by my 2-in-a-row instantunsuccessfulnesses I started yet another project: Forecast from Knitty.
About which I blabbed a little here
And would like to emphasize at this point the importance of local markets, specially when they carry better yarns than local yarn shops do. And cheaper prices, for the yarn is produced in small farms and sold exclusevely on local markets, you just have to find the right stall.
In these occasions you are truly reminded that largely the best and most beautiful yarns from Europe are made in Italy.

And while celebrating the long weekend il Ponte (28th April - 1st May) in Pescara I found a yarn shop and bought, guess what, of course, yarn. This time the shiny and soft and elegant Filatura di Crosa Millefini Fine 100% cotton:Aren't the colors just great?
It is turning into another Clapotis, one of my favourtie patterns:

Monday, March 26, 2007

Self-motivation

It is getting out of hand for the millonth time at Casa Mia. I have again collected too many UFOs around the house.

Like:
1) Yoke sweater for me (I am aware the winter is over)
2) Baby-boy set (must finish tonight, for he was born last night and they tend to grow too fast) Updtae: redoing. I think it's too small.
2) Baby-girl set (have 4 weeks, but want to finish ASAP)
3) Gray socks
4) A bag to be felted (deadline june)

The most embrassing ones, which only need to have the ends darned in:
1) a Phildar vest for my daughter
2) Swallwotail Shawl number two
3) a load of socks

And of course I am already keen to start woth projects like (have already swatched):
1) S. Japel's cute sweater from Interweave Knits Spring 2007
2) Koigu Jacket
3) N. Gaughan amazing spiral tunic from her book

It is obviously too much!